Live ship traffic in the Panama Canal

Current situation, November 2026

In November 2026 the Panama Canal Authority, citing improving water conditions, raised the maximum draft at the Neopanamax locks to 50 feet (15.24 m) and daily capacity to 34 transit slots. In September, citing below-expected rainfall, it had cut both. According to IMF PortWatch data, about 27 cargo ships and tankers a day passed through the canal in October 2026, against about 32 in October 2025.

Key facts

Links
The Caribbean Sea with the Pacific Ocean
Length
About 82 km
Panamax locks
Gatun; Pedro Miguel and Miraflores
Neopanamax locks
Agua Clara and Cocolí (2016), chambers 427 × 55 m
Gatun Lake
Fresh water, about 26 m above sea level
Run by
Panama Canal Authority (ACP), since 1999
Ports at the ends
Cristóbal (Atlantic); Balboa (Pacific)
Map centre
9.13° N, 79.53° W

Ships in the Panama Canal at their latest AIS positions.

Why the Panama Canal matters

The Panama Canal is an artificial waterway across Panama, 82 km long, joining the Caribbean Sea, on the Atlantic side, with the Pacific Ocean.

The US Energy Information Administration (EIA) puts the oil and petroleum products carried through the canal in fiscal year 2025 (October 2024 to September 2025) at an average of about 2.3 million barrels a day, almost all of it refined products. That is 3% of the world's seaborne trade in oil and petroleum products. For gas carriers taking propane and other liquefied gases from the US Gulf Coast to East Asia, the canal is the shortest route.

The Panama Canal Authority (ACP) counted 13,951 transits in fiscal year 2026 (October 2025 to September 2026), 4.1% more than in fiscal year 2025. By its own tonnage measure, PC/UMS, that came to 521 million tons. The ACP credits the growth to energy cargoes and container ships.

Locks and Gatun Lake

Ships climb three lock steps to Gatun Lake and go down three on the far side. The lake is artificial, made by damming the Chagres River; it holds fresh water and lies about 26 m above sea level. The original locks are Gatun on the Atlantic side and Pedro Miguel and Miraflores on the Pacific side, with chambers 33.5 m wide.

A third lane with larger locks was built between September 2007 and May 2016: Agua Clara on the Atlantic side and Cocolí on the Pacific side. Their chambers are 427 m long and 55 m wide, sized for the larger Neopanamax ships, and the expanded canal opened for commercial traffic in June 2016. Each new chamber has three water-saving basins, which the ACP says reuse up to 60% of the water in each lockage.

The locks are filled with fresh water from Gatun Lake, and every ship that passes uses millions of litres of it. When the lake level drops, the ACP limits ships' draught and the number of transits. For a long-term water supply, it plans a reservoir on the Río Indio.

Who runs the canal, and how ships pass

France started building the canal in 1881 and gave up in 1889. The United States took over the canal property in May 1904, and the canal opened to ships in August 1914. Under the Torrijos–Carter Treaties, signed in September 1977, Panama took full control in December 1999. One of the two treaties, on the canal's permanent neutrality, provides for neutral service to ships of all nations and leaves the United States a permanent right to defend the canal. The Panama Canal Authority, owned by the government of Panama, runs it.

An ACP pilot boards every ship and steers it from the start of the transit to the end, and tugboats go through the canal with the ships.

Ships book their transit slots in advance, and the ACP sells three to five of each day's slots at auction. The ACP says a booking is the only way to be sure of a transit date, and ships without one may face very long delays. It sets the maximum draught at the Neopanamax locks by the current and forecast level of Gatun Lake.

Droughts, limits and other events since 2023

  • July–December 2023. In a drought, the ACP limited the canal to 32 transits a day from July 2023 and cut the maximum draught at the Neopanamax locks from 50 to 44 feet. October 2023 was the driest October since 1950, and from November the ACP cut daily transits further.
  • August 2024. Bloomberg reported that the ACP had raised the maximum draught back to 50 feet and would allow 36 ships a day.
  • January 2026. Panama's Supreme Court ruled a port concession unconstitutional. Under it, a subsidiary of Hong Kong's CK Hutchison ran the container ports of Balboa, on the canal's Pacific side, and Cristóbal, on its Atlantic side. Panama's president said the ports at both ends of the canal would keep working without a break.
  • January–April 2026. By the ACP's figures, an average of 34 ships a day passed through in January 2026 and 37 in March. The average price of a slot sold at auction rose to about $385,000 in March and April, up from $135,000–140,000 before the conflict in the Middle East.
  • August–September 2026. Pointing to lower than expected rainfall in the canal's watershed, the ACP lowered the maximum draught at the Neopanamax locks to 48 feet, then in September cut the number of daily slots, to 32 by the middle of the month. The ACP said this was only the second time in the canal's history that it had reduced daily transits. Bloomberg reported that the war with Iran had pushed more traffic to the canal, and that in late August ships without a booking waited up to eight days to go through northbound.
  • September–October 2026. Citing rainfall close to average, though the watershed was still short of water, the ACP raised the maximum draught to 49 feet at the end of September and the daily slots to 33 from the middle of October.

Traffic counts

IMF PortWatch counts cargo ships and tankers from their AIS signals. On its figures, the canal averaged about 32 of them a day in 2019 and about 30 in 2023. In January 2024, with the drought limits in force, the average dropped to about 20, and 2024 as a whole averaged about 27. In 2025 it was about 31 a day, about 13 of them tankers.

Reading the map

The map opens on the canal. Ships waiting for their transit lie at anchor off both ends, and a ship without a booking can wait several days to pass: zoom out to see the anchorages and the approaches from the Caribbean and the Pacific. The ACP publishes the current draught limits and slot numbers in its advisories to shipping on pancanal.com.

Adapted from the Wikipedia articles Panama Canal, Panama Canal expansion project and Torrijos–Carter Treaties, licence CC BY-SA 4.0.

Common questions

Is the Panama Canal open to shipping now?

When water runs short, the Panama Canal Authority (ACP) limits ships' draught and the number of transits a day, as it did in 2023–2024 and again in 2026. When our last check is recent, this page shows it under "Current situation", with its month. The ACP publishes the current limits in its advisories to shipping at pancanal.com.

Why does the level of Gatun Lake limit ships?

The locks are filled with fresh water from Gatun Lake, and every ship that passes uses millions of litres. When the lake is low, the ACP lowers the maximum draught at the Neopanamax locks and the number of transits a day; in 2023 it cut the draught from 50 to 44 feet. The newer locks reuse up to 60% of their water through water-saving basins.

Can I watch tankers in the Panama Canal live?

Yes, as long as the tanker's AIS is on. Tap or click a ship for its name, flag, type, speed and course, and its next port when the crew has entered one. Ships waiting for their transit lie at anchor off both ends of the canal: zoom out to see them.

How much oil goes through the Panama Canal?

The EIA puts it at an average of about 2.3 million barrels a day of oil and petroleum products in fiscal year 2025 (October 2024 to September 2025). Almost all of it was refined products rather than crude oil, and most went southbound. That was 3% of the world's seaborne trade in oil and petroleum products. The canal is also the shortest route for gas carriers taking propane and other liquefied gases from the US Gulf Coast to East Asia.

Who steers ships through the canal?

Panama Canal Authority pilots. The ACP says a pilot boards every ship and steers it from the start of the transit to the end, and tugboats go through the canal with the ships.

Does a ship need to book its transit?

A booking is the only way to be sure of a transit date, and the ACP warns that ships without one may face very long delays. The ACP sells three to five of each day's slots at auction.

All maps